Description
E2U Polyaspartics is the next generation in two component, fast drying, Aliphatic Polyurea. While other Polyaspartics can only be applied between 8 and 10 mil, E2U Polyaspartic can be applied in a single coat up to 30 mils. It features good abrasion and chemical resistance, and a cure time of four to six hours. It can be installed in extremely high or low temperatures. It is the ideal product when low odor, fast turnaround and a non-yellowing system are essential.
Physical Properties
Volumetric Ratio: . . . . . . . . . . . . . . . . 1 to 1
Volumetric Solids . . . . . . . . . . . . . . . .. 85%
Coverage: . . . . . . . . . . 200 SF/Gal @ 8 mil
Application temperature: . . . . .35-100°F
Thinning: . . . . . . . . . . . . . . . . .Not required
Pot life: . . . . . . . . . . . . . . . . . 15-20 minutes
Working time on floor: . . 15-20 minutes
Cure time: . . . . . . . . . . . . . . . . . . .4-6 hours
Critical recoat time: . . . . . . . . . . . 12 hours
Shelf life: . . . . . . . . . . . . . . . . . . . 12 months
USDA Food & Beverage:. . . . Meets Req.
Color: Clear
Available Colors:
Clear | Beige |
Light Gray | Tile Red |
Medium Gray | Safety Red |
Dark Gray | Safety Blue |
White | Safety Green |
Black | Safety Yellow |
Tan |
Packaging
2 Gallon Kit:
PartA . . . . . . . . . . . . . . . . . . . . . . . . . . .1 gal.
Part B. . . . . . . . . . . . . . . . . . . . . . . . . . .1 gal.
10 Gallon Kit:
PartA . . . . . . . . . . . . . . . . . . . . . . . . . . .5 gal.
Part B. . . . . . . . . . . . . . . . . . . . . . . . . . .5 gal.
Ground level concrete slabs emit invisible moisture vapor. The allowable moisture emissions for concrete are 3 lbs / 1,000 SF over a 24 hour period. If moisture is above this level, then blistering and delamination of coating may occur. A calcium chloride test should be preformed to determine concrete moisture level. If moisture levels exceed the 3 lb. limit, a concrete moisture vapor control system should be used first before applying coating system. Please contact the technical department for approved systems. Coating systems are susceptible to cracking if the concrete moves or separates below the coating. Hence, joint and crack treatment should be reviewed prior to coating application.
As a general rule, control joints (saw cuts) and random cracks should be saw cut or chased first then filled with Easy Patch or similar approved hard epoxy product. Construction joints (two slabs which meet and hence move) should be treated. After the coating has been applied and cured, saw cut through the coating over construction joints and apply an elastodynamics caulking.
E2U products are warranted for one year after date of application. Please refer to the Limited Material warranty for additional clarification.
Consult material safety data sheet. Avoid contact with skin. Some individuals may be allergic to epoxy resin. Protective gloves and clothing are recommended.